Business Verticals


MEN & MODERN MACHINE CREATES WONDERS WITH STEEL AT SSFM GROUP

SSFM has won TRUST of our esteemed customers by partnering with us for their various projects, just because of its formidable capabilities & dedication for timely completions. Proven time and again SSFM GROUP has assembled at its all facilities the people, modern machines and advanced technologies that can deliver the most complex of steel structures and solutions for the most challenging of engineering projects conceivable Always on time.

In the ever changing world of steel fabrication, SSFM has learnt to adapt to change and is growing slow but steady. Thanks to our CMD’s foresight and pragmatic thinking with long term vision. We have focused more on speed, quality and price, which are the driving factors today. To achieve these ideals, SSSFM has paid special attention to factors like:

  • Environment Health & Safety (EHS) Compliance
  • Quality at First – Do it right every time and each time
  • Fast & Timely Raw material Procurement
  • Continuous Training Man power & their sustainability
  • Connectivity to National Highways for ODC.
  • Add more Modern machines & technologies at works time to time
  • CSound Vendor management
  • Transporters availability
  • Market dynamics
  • Customer Needs

All its units have been designed for scalability, which enables us to quickly increase capacity and cater to spikes in demand.

Highrise Buildings

Airports

Sports Stadia

Bridges FOD & ROB

Metro & Mono Rail Terminals

Parking Lots

Industrial

Seaports

Large Dia. Piping & Systems
TSB Frames
Ducting for all Industrial needs
Advanced Tanks & Vessels Manufacturing
Star Columns
Box Columns / Truss
Boiler / ESP Structures
Launching Girders
Steel Fabricated Stacks / Chimneys
Railway Girders / FOB / ROB
Heavy Trusses
Nodes Fabrications of main truss

EPC Projects / Services


Mountains

RADIAL GATES WITH STOP LOG GATE & ROPE DRUM HOIST

Dist: Wardha
Size of gate: 12Mtr X 8.00 Mtr

Mountains

VERTICAL LIFT GATES WITH ROPE DRUM HOIST

Project: Lower Chulbandh Medium Irrigation Project, Sakoli
Dist: Bhandara
Size of gate: 12Mtr X 6.3 Mtr

Mountains



Mountains

PIPELINE WORK – 1300 DIA

Project: Satrapur Lift Irrigation Scheme
Dist: Nagpur
Total Km: 12 Km

Mountains

PIPELINE WORK – 1300 DIA

Project: Jigaon Lift Irrigation
Dist: Buldana
Total Km: 12.5Km

Mountains

WATER & AIR VESSEL

Project: M/S Nerla Lift Irrigation Scheme
Dist: Bhandara
Capacity: 180M3

Mountains

WATER & AIR VESSEL

Project: M/S Bhorghat Lift Irrigation Scheme
Dist: Chanrapur
Capacity: 180 M3

Mountains

Project: Gosekhurd DAM Project Scheme
Dist: Bhandara

Mountains

PENSTOCK STEEL LINER WORK

Project: Dhukwan Shep ( 3X8MW)
Dist: Jhansi ( UP)

Mountains

VERTICAL LIFT GATES & STOPLOG GATE

Project: Pulgaon Barrage, Deoli
Dist: Wardha

Mountains

RADIAL GATES WITH STOP LOG GATE & ROPE DRUM HOIST

Project: Jigaon Project
Dist: Bhldhana
Size of Gate: 15.00Mtr X 12.00Mtr

C
O
N
T
A
C
t
U
S